Tawa College B Block Refurbishment

SCOPE:

Tawa College of Wellington wanted to refurbish the toilet areas to the B & C blocks of the school. Zhoosh was the appointed contractor who worked with the school to complete the toilet block refurbishment.

Our work involved the demolition and strip out of existing outdated toilet facilities. We constructed new offices and unisex toilet cubicles suited to modern learning centres of the 21st century.

There were many challenges that arose in working with a 60-year-old building however Zhoosh overcame these issues with careful planning and our experience in the interior construction industry.

CLIENT CHALLENGES:

The existing toilet blocks were the original 1970s design and outdated. The college required a modern 21st-century ablutions area which included refurbishing the existing toilet blocks and converting them into individual uni-sex cubicles.

The new cubicles we designed in a way to give students maximum privacy a clean and bright modern ablutions facilities.

SOLUTION:

Zhoosh carried out the refurbishment project over 4 months and the refurbishment scope of work included, stripping out existing toilets and basins, removing wall linings, constructing new timber-framed walls, the installation of new doors, linings, painting and finishings to ceilings, walls & floors.

The refurbishment project included upgrading all the lighting with new sensor LED lighting, new hand dryers, sanitary fittings and an upgrade to the fire alarm system.

Other Projects
View Project

Wellington Building

View Project

Tawa College

View Project

Spice Traders

View Project

Forte

View Project

Lady Allum

View Project

Mamas Donuts

View Project

Actrol Hamilton

View Project

Liston College

View Project

Oakland Care

View Project

Reece Plumbing Addington

View Project

Jenny Craig Manukau

View Project

Findex

View Project

Sunglass Hutt

View Project

Fraser Cove